Underestimating the time and resource required to correctly transport NORM (Naturally Occurring Radioactive Material) or TENORM (Technologically Enhanced Naturally Occurring Radioactive Material) during decommissioning could prove to be costly, not least because it is likely to cause delays in shipping. It is clear that there are many considerations required to managing the transport of NORM and TENORM. Consultation with experts at the very early stages will be essential and could lead to significant cost saving benefits.