The ultimate objective of every pig run is to complete the required task, and return the pipeline to its original operating condition in the shortest time possible. A stuck pig causes delays, resulting in higher project costs, so it is important to have a contingency plan should the pig become stuck.
In this blog, we will discuss using a case study example how the implementation of our pig tracking technology allowed a customer to effectively and accurately track/time the pig trains progression down the length of the pipeline, thus resulting in huge savings on vessel and equipment costs.